Guide · 8 min read · UK trades

How to price jobs — a method for UK trade businesses

Most trade owners price jobs the way they learned on day one: guess the labour, add some margin, hope for the best. If you’ve been running the business more than a year or two, that method is probably costing you somewhere between £5,000 and £20,000 a year without you knowing it. Here’s a cleaner method, and a worked example you can plug your own numbers into.

What’s on this page

  1. Why undercharging is the leak you don’t see
  2. The six parts of a job price
  3. A worked example
  4. By trade — what to adjust
  5. When to walk away from a job
  6. Reviewing prices every quarter
  7. Common questions

Why undercharging is the leak you don’t see

Undercharging doesn’t look like a leak because you’re busy and the money’s coming in. But it compounds. Every job you book at the wrong price locks up a day you can’t book at the right one. The sum of those bad bookings over a year is bigger than almost any marketing problem.

Three signs you’re undercharging:

The underlying issue isn’t that you don’t know numbers. It’s that no one taught you to break a price into its parts and look at each one separately.

The six parts of a job price

Every job price is made of six things. Many trade owners count four of them. Here are all six.

1. Materials

Easy. You know what the materials cost. Add a markup — your customer isn’t a trade buyer and shouldn’t pay trade-counter prices. 15% to 25% is standard. Zero markup means you’re buying inventory for free.

2. Labour, at the real hourly cost

“My apprentice costs me £15 an hour.”

No, he doesn’t. Add:

The real cost is somewhere between £22 and £28 an hour for that £15/hr apprentice. Apply the same maths to yourself: if you draw £60,000 a year, you cost the business comfortably over £35 an hour fully-loaded.

3. Overheads, allocated per hour

Van, fuel, tools, insurance, software, phone, accounting, premises, marketing. Add them up annually. Divide by your billable hours per year — realistically 1,400 to 1,600 for an owner-operator, not the 2,000 you might assume. That’s your overhead rate per billable hour. It goes on top of the labour rate.

4. Travel

A site 15 minutes from your base, two sides, is 30 minutes a day — 2.5 hours a week — 125 hours a year. That’s three full billable weeks a year you’ve given away. Costed, this becomes meaningful.

Four options: charge travel explicitly, build it into the day rate, cap it at 15 minutes free each way, or quote a travel-inclusive price for the whole job. Pick one, use it consistently.

5. Margin

What the business earns on top of covering costs. Not what you earn — your salary is in the labour line.

Minimum sustainable margin: 15%. Healthy: 20–25%. Trade businesses that scale: 25–30% and up. If a quote only covers your real costs with no margin, you’re running a service club, not a business. There’s no money to invest in a new van, a new hire, or a pension.

6. Contingency

10–15%. Covers the unknowns: the hidden pipe, the extra bend, the delivery that was wrong, the day it rained.

If the contingency doesn’t get used, you keep it and the margin is healthier. If it does, you’ve already priced for it.

A worked example

Two-day heating install. Figures below are illustrative only — plug in your own.

LineFigureHow it was calculated
Materials£800 + 20%Supplier price with retail-equivalent markup
Your labour12 h × £38/hFully-loaded owner rate
Second person12 h × £24/hFully-loaded apprentice rate
Overhead allocation24 h × £8/hOverheads ÷ billable hours per year
TravelIncludedWithin 15 min of base
Subtotal£1,920Sum of the above
Margin25% × subtotalBusiness margin on top of real cost
Contingency10% × subtotalUnknowns reserve
Price to customer≈ £2,595What goes on the quote

Figures above are illustrative only. Your real numbers will differ by trade, region and job type.

Three things to notice:

  1. You never priced “to beat the competition.” You priced to cover your costs plus a sustainable margin.
  2. Margin and contingency are the only two negotiable lines. If the customer pushes back, you have specific numbers to flex on — not vibes.
  3. You wrote this once. Next similar job you only change the materials and hours.

Not sure if you’re undercharging?

The free 8-minute WorkSense audit scores your pricing discipline, lead response, follow-up and online presence. Instant on-screen score, no sales call.

Take the free audit

By trade — what to adjust

Plumbing and heating

Electrical

Building

Roofing

When to walk away from a job

Not every job is worth having. Walk away when:

A walked-away job is a kept margin. A job you take at the wrong price at the wrong time costs you twice: the money you don’t make, and the capacity you can’t sell.

Reviewing prices every quarter

Once a quarter, 30 minutes:

  1. Pull the last three months of invoices. For each job, what was the actual gross margin after all the real costs?
  2. Any supplier price-ups since last quarter? Pass them through.
  3. Any new overheads crept in — software subscriptions, insurance, tool fees?
  4. Any job type where you consistently come in under margin? Reprice it or stop quoting on it.

That half-hour is the single highest-ROI finance exercise a trade owner can do. It takes less time than one wasted quote-chasing phone call.

Want to find out where else your business is leaking revenue?

The free 8-minute WorkSense audit scores pricing, lead response, follow-up and online presence across 20 questions. Instant on-screen score. No sales call.

Take the free audit

Common questions

What margin should a UK trade business aim for?

20% minimum for sustainability. 25–30% is where a business starts being able to invest in growth. Below 15% is a service, not a business.

Should I charge for travel time?

If a site is more than 15 minutes from your base, yes. Either explicitly on the quote or built into your day rate. Giving away travel is giving away billable hours.

How do I handle a customer who always haggles on price?

Give one small, specific concession — such as holding today’s quote for 14 days — not a general discount. If they still push, hold your price. Haggle-every-time customers typically expect you to absorb variations later. The discount compounds against you.

How often should I review my prices?

Quarterly minimum. Every time a key supplier changes price. Every time you take on a new overhead subscription over £30 a month.

What is a fully-loaded labour rate?

The real cost of an hour of someone’s work — not just their pay. Add employer NI, pension, paid holiday, sick days, training time, and the admin time managing them. For a £15/hr apprentice this is typically £22–£28/hr fully-loaded. For an owner on £60,000 drawings it’s often £35–£45/hr.

What if I quote a job and they go silent?

Chase. A follow-up at day 3, day 7 and day 14 recovers more quotes than most trade owners expect. Open quotes aren’t lost until you’ve confirmed they are.